Installation of 19m reach Bolted BMU

Cento are please to announce the topping out of the Great West Quarter BMU.

Principle Contractor: Barratt Developments

Project:

The 25 storey contemporary residential building known as ‘The Tower’ is situated within the Great West Quarter multi-development in Brentford.

The BMU:

19m reach BMU fixed back to the main frame of the BMU structure equipped with a rated load point of 500kg or 400kg hoisting bar.

Scope of Works:

  • 3m cantilever cradle
  • 95m hoisting height
  • Supply and install electrical supply system

 

Please contact Barry Murphy if you would like more details on this project.