Imperial West Installation Update

Principle Contractor: Laing O’Rourke

Client: Imperial West College

Project: New state of the art research and development facility

The BMU:

1 No. Fully powered Manntech GmbH Type 6.1/2000 ‘Z’ Luffing 15.5 Metre fixed reach Building Maintenance Unit complete with 805Kg SWL integrated winch for glass/cladding panel replacement and 240Kg SWL cradle.

 

Scope of Works:

Provide a BMU system that elevates overthe 3.8m obstructions to give full façade coverage.

Cento designed and managed the whole project throughout, including:

  • Supply and install 22 ton of track
  • Supply and install oversailing restrictions
  • Supply and install electrical supply system

 

Please contact Barry Murphy if you would like more details on this project.